# Tam Junction king tides and high water in 2008

> In 2008, NOAA's San Francisco tide gauge recorded water high enough for FloodRoute's model to put at least one Tam Junction road at risk on 54 days. The highest was 7.40 ft on Friday, January 4, 2008, 1.44 ft above the tide tables, with 32 roads at risk, including Cardinal Road, Starling Road and Flamingo Road.

**Estimates, not records of actual flooding.** Each day is NOAA's verified high water at the tide gauge, run through FloodRoute's flood model on today's roads and elevations, in dry weather. Drains, levees, tide gates, rain, road changes and elevation error all mean real conditions differed. Not for property, real-estate, insurance, lending, engineering or legal decisions.

## Every day with roads at risk (54)

| Date | High water (San Francisco gauge, ft MLLW) | vs tide tables | Roads at risk | Severity | Deepest streets (model) |
|---|---|---|---|---|---|
| Jan 4, 2008 | 7.40 | +1.44 ft | 32 | Severe | Cardinal Road, Starling Road, Flamingo Road |
| Jan 5, 2008 | 6.75 | +0.66 ft | 2 | Likely | Pohono Street, CA 1 |
| Jan 6, 2008 | 6.50 | +0.31 ft | 2 | Likely | Pohono Street, CA 1 |
| Jan 8, 2008 | 6.47 | +0.20 ft | 2 | Likely | Pohono Street, CA 1 |
| Jan 20, 2008 | 6.83 | −0.05 ft | 2 | Likely | Pohono Street, CA 1 |
| Jan 21, 2008 | 7.05 | +0.14 ft | 2 | Likely | Pohono Street, CA 1 |
| Jan 22, 2008 | 6.85 | +0.06 ft | 2 | Likely | Pohono Street, CA 1 |
| Jan 23, 2008 | 6.75 | +0.25 ft | 2 | Likely | Pohono Street, CA 1 |
| Jan 24, 2008 | 6.68 | +0.61 ft | 2 | Likely | Pohono Street, CA 1 |
| Feb 19, 2008 | 6.50 | +0.16 ft | 2 | Likely | Pohono Street, CA 1 |
| Feb 21, 2008 | 6.55 | +0.66 ft | 2 | Likely | Pohono Street, CA 1 |
| Feb 24, 2008 | 6.46 | +0.93 ft | 2 | Likely | Pohono Street, CA 1 |
| May 4, 2008 | 6.59 | +0.09 ft | 2 | Likely | Pohono Street, CA 1 |
| May 5, 2008 | 6.81 | +0.11 ft | 2 | Likely | Pohono Street, CA 1 |
| May 7, 2008 | 6.62 | −0.11 ft | 2 | Likely | Pohono Street, CA 1 |
| May 8, 2008 | 6.55 | −0.01 ft | 2 | Likely | Pohono Street, CA 1 |
| Jun 1, 2008 | 6.58 | −0.12 ft | 2 | Likely | Pohono Street, CA 1 |
| Jun 2, 2008 | 6.83 | −0.11 ft | 2 | Likely | Pohono Street, CA 1 |
| Jun 3, 2008 | 7.05 | +0.02 ft | 2 | Likely | Pohono Street, CA 1 |
| Jun 5, 2008 | 6.77 | −0.17 ft | 2 | Likely | Pohono Street, CA 1 |
| Jun 6, 2008 | 6.50 | −0.17 ft | 2 | Likely | Pohono Street, CA 1 |
| Jun 28, 2008 | 6.57 | +0.15 ft | 2 | Likely | Pohono Street, CA 1 |
| Jun 29, 2008 | 6.85 | +0.10 ft | 2 | Likely | Pohono Street, CA 1 |
| Jun 30, 2008 | 7.09 | +0.09 ft | 2 | Likely | Pohono Street, CA 1 |
| Jul 1, 2008 | 7.20 | +0.06 ft | 29 | Severe | Cardinal Road, Starling Road, Flamingo Road |
| Jul 2, 2008 | 7.17 | +0.02 ft | 2 | Likely | Pohono Street, CA 1 |
| Jul 4, 2008 | 6.99 | ±0.00 ft | 2 | Likely | Pohono Street, CA 1 |
| Jul 5, 2008 | 6.66 | +0.02 ft | 2 | Likely | Pohono Street, CA 1 |
| Jul 27, 2008 | 6.62 | +0.06 ft | 2 | Likely | Pohono Street, CA 1 |
| Jul 28, 2008 | 6.82 | +0.04 ft | 2 | Likely | Pohono Street, CA 1 |
| Jul 29, 2008 | 7.02 | +0.07 ft | 2 | Likely | Pohono Street, CA 1 |
| Jul 30, 2008 | 7.13 | +0.09 ft | 2 | Likely | Pohono Street, CA 1 |
| Jul 31, 2008 | 6.98 | +0.01 ft | 2 | Likely | Pohono Street, CA 1 |
| Aug 2, 2008 | 6.71 | −0.04 ft | 2 | Likely | Pohono Street, CA 1 |
| Aug 26, 2008 | 6.65 | +0.21 ft | 2 | Likely | Pohono Street, CA 1 |
| Aug 27, 2008 | 6.79 | +0.25 ft | 2 | Likely | Pohono Street, CA 1 |
| Aug 28, 2008 | 6.84 | +0.29 ft | 2 | Likely | Pohono Street, CA 1 |
| Aug 29, 2008 | 6.77 | +0.35 ft | 2 | Likely | Pohono Street, CA 1 |
| Aug 31, 2008 | 6.52 | +0.36 ft | 2 | Likely | Pohono Street, CA 1 |
| Oct 15, 2008 | 6.49 | +0.04 ft | 2 | Likely | Pohono Street, CA 1 |
| Oct 16, 2008 | 6.61 | ±0.00 ft | 2 | Likely | Pohono Street, CA 1 |
| Oct 17, 2008 | 6.75 | +0.11 ft | 2 | Likely | Pohono Street, CA 1 |
| Nov 13, 2008 | 6.76 | −0.16 ft | 2 | Likely | Pohono Street, CA 1 |
| Nov 14, 2008 | 6.94 | −0.05 ft | 2 | Likely | Pohono Street, CA 1 |
| Nov 15, 2008 | 6.84 | −0.05 ft | 2 | Likely | Pohono Street, CA 1 |
| Nov 16, 2008 | 6.62 | +0.02 ft | 2 | Likely | Pohono Street, CA 1 |
| Nov 26, 2008 | 6.52 | +0.33 ft | 2 | Likely | Pohono Street, CA 1 |
| Dec 11, 2008 | 7.04 | −0.03 ft | 2 | Likely | Pohono Street, CA 1 |
| Dec 12, 2008 | 7.31 | +0.09 ft | 29 | Severe | Cardinal Road, Starling Road, Flamingo Road |
| Dec 13, 2008 | 7.15 | −0.06 ft | 2 | Likely | Pohono Street, CA 1 |
| Dec 14, 2008 | 7.20 | +0.18 ft | 29 | Severe | Cardinal Road, Starling Road, Flamingo Road |
| Dec 15, 2008 | 6.77 | +0.16 ft | 2 | Likely | Pohono Street, CA 1 |
| Dec 24, 2008 | 6.49 | +0.35 ft | 2 | Likely | Pohono Street, CA 1 |
| Dec 25, 2008 | 6.67 | +0.52 ft | 2 | Likely | Pohono Street, CA 1 |

[All Tam Junction history](https://floodroute.com/ca/tam-junction/history.md) · [Live forecast](https://floodroute.com/ca/tam-junction.md)

Data: [CSV](https://floodroute.com/data/history/ca/tam-junction.csv) · [JSON](https://floodroute.com/data/history/ca/tam-junction.json) · Open Database License (ODbL) 1.0 (https://opendatacommons.org/licenses/odbl/1-0/) · Credit: FloodRoute (floodroute.com), © OpenStreetMap contributors, NOAA CO-OPS · [All towns](https://floodroute.com/data.md)

---

Web version: https://floodroute.com/ca/tam-junction/history/2008 · Site index for AI agents: https://floodroute.com/llms.txt · Every page is available as Markdown: add `.md` to its URL.

FloodRoute provides estimates only. Never drive or walk through flood water. © Axiomic, LLC · contact@axiomic.ai
